Call 07792022630

Trevone

This was a very challenging job both at the design phase and installation.

Because of the unusual shape, working out the outlet position, the gutter depths, fall directions and ventilation locations took a lot of careful consideration. 

With a limit on the maximum build-up height of the roof, one gutter section had to be done using code 11 lead to allow for an unusually long run.