Fully Clad Dormer
This project is overlook the Camel Estuary from Rock in Cornwall. Due to the width, the roof runs either way from the ridge. The code 7 roof deck is fully vented from the side soffits.
The code 6 vertical cladding on the above the window is to break down what is a large area of lead to avoid looking to bulky. This gives a look that is in-keeping with the architectural style of the rest of the building as well as providing strong protection against the sometimes brutal weather that blows in from the Atlantic.